One neutral sourcing desk handling XCMG, SANY & Zoomlion export logistics, customs and after-sales under one roof.
The Crossing, Stage by Stage
The ocean stops being your problem the moment the balance is confirmed. Here's exactly what the desk handles so you don't.
3rd-party inspection report delivered before you pay the balance.
RORO or container knock-down for cranes over 3.5m width.
Bill-of-lading number emailed within 48h of departure.
HS codes, CE/EAC docs & commercial invoice pack prepped for your broker.
Engineer dispatched for commissioning and operator handover.
Shipping Method Decision Matrix
Match your crane type to the right method — then send us the port and tonnage. We quote the exact route.
| Method | Best For | Transit Window | Cost Profile | Crane Prep | |
|---|---|---|---|---|---|
RORO Roll-on / Roll-off |
Wheeled truck, rough-terrain & all-terrain cranes | 25–40 days | Lowest cost | Driven on/off deck | Inquire Now |
Container 20ft / 40ft / 40HQ |
Small truck cranes & dismantled components | 30–45 days | Mid cost | Partial knock-down | Inquire Now |
Flat-Rack / Open-Top Oversize deck cargo |
Crawler crane tracks, counterweights, boom sections | 30–50 days | Mid–high cost | Lashed & surveyed | Inquire Now |
Bulk / Breakbulk Heavy-lift vessel |
100T+ all-terrain & tower crane masts | 35–60 days | Project-rate | Heavy-lift vessel w/ crane survey | Inquire Now |
After the Crane Lands
Genuine XCMG, SANY & Zoomlion spares air-freighted in 5–7 days.
A single English-speaking case owner. Defects documented, resolved or replaced — no brand finger-pointing between factories.
Video-diagnostics within 24h, plus engineer dispatch to your country for commissioning and operator training.
Request Your Quote
Clearance & Logistics
We prepare the full document pack — commercial invoice, packing list, CE/EAC certificates and HS codes. Your local broker clears, and we troubleshoot alongside them if anything flags.
Breakbulk / heavy-lift. We book vessel space and arrange the crane survey required for over-dimensional and over-weight units.
A single case owner takes it from report to resolution — genuine parts air-freighted in 5–7 days, all under the 12-month warranty.
FOB, CIF, or DAP — your choice, clearly stated on every quote so there are no surprises in the landed cost.
One business day, with a full landed-cost breakdown — FOB + freight + insurance + estimated duties.